Skip to content

Lock Project on Waterway

Scope of Works

Pronto recently carried out repair work on a sea lock at the entrance to a Canal for a local Council. This work entailed the replacement of the existing PLC which had been water damaged. Pronto replaced and programmed the PLC from scratch to the original specification.